Summer season from june 23rd to september 1st, 2018.

Road access info

 

[ROAD ACCESS INFORMATION]

FROM GRENOBLE
Take the motorway to Grenoble and leave at Exit 8 for Briançon & Vizille.
Then take the D1091 towards Briançon via Le Bourg d'Oisans.
Turn right at the Chambon dam and drive up the D213.


FROM BRIANCON / ITALY

→ The Chambon Tunnel road is closed until december 15th, 2017. 
Please take the "rescue road" (5.30km on the left side of Chambon lake).
→ For 3.5t trucks and campers Les 2 Alpes access from Briançon/Italy is mandatory via Frejus Tunnel .

 

HAVE A SAFE TRIP!

CLIMBING FOR LIFE

 

Road cycling rally to the fight against diabetes !

 

Thursday August 18th:
- Welcome of participants and distribution of welcome packs (Palais des Sports)
- Cycling discovery ride to La Bérarde

Friday August 19th:
- Welcome of participants and distribution of welcome packs (Palais des Sports)
- Cycling discovery ride climbing up to Alpe d'Huez
- 10 kilometre trail
- VIP meal

Saturday August 20th:
- Granfondo Les 2 Alpes
- Climbing for life
- Between 15-20 kilometre trail
- Pasta party (12noon-5pm)
- Concert Night (9pm – 2am)

Sunday August 21st:
- Against the clock challenge

 

REGISTRATIONS ARE CLOSED.

INFO / RULES / 

 

climbing16

Or using your 2 Alpes ID & password

Register